Clean Energy, Cleaner Plane
Advisory • Design • Management
To contribute to sustainable development by providing efficient and reliable energy solutions.
To be a leading force in the renewable energy sector, transforming natural resources into sustainable power, and driving the global transition to a greener, more sustainable future.
Mission
Vision
Values
- Sustainability: We are committed to creating a sustainable future through clean energy.
- Innovation: We strive to innovate and enhance our technology and processes.
- Integrity: We conduct our business with the highest ethical standards.
- Excellence: We pursue excellence in all aspects of our operations.
- Safety: We prioritize the safety of our employees, communities, and the environment.
Directors of JHPPL
- Mr. Nitin Marotrao Upare
- Mr. Shyamsunder Mittal
- Mr. Ranjeetsingh Chhabda
- Mr. Sanket Bawankule
Directors of Malka
- Mr. Nitin Marotrao Upare
- Mr. Shyamsunder Mittal
- Mr. Ranjeetsingh Chhabda
Mand Small Hydro Power Project
Project Description

Project Highlights
- Location: Damas Village, Dharmajaygarh Taluk, Raigarh District, Chhattisgarh, India.
- River: Mand River, a tributary of the Mahanadi River.
- Capacity: 8 MW installed capacity.
- Project Type: Run-of-the-river hydroelectric scheme.
- Catchment Area: 2358 square kilometers, entirely rain-fed.
- Weir: Ungated weir on the right bank of the Mand River.
Design Specifications
- Designed Head: 24.00 meters
- Net Head: 21.00 meters
- Design Discharge: 46.00 cubic meters per second
- Annual Energy Generation: 33.60 million units (MU) in a 75% dependable year
- Net Salable Units: 32.93 MU
Key Facts
- Project Cost: ₹84.50 Crore (₹10.56 Crore per MW)
- Funding:
- Term Loan: ₹59.15 Crore (70%)
- Equity: ₹25.35 Crore (30%)
- Plant Load Factor: 47.95%
- Tariff: ₹6.54 per kWh (as per Chhattisgarh State Electricity Regulatory Commission)
- Debt Service Coverage Ratio (DSCR):
- Average DSCR: 2.35
- Maximum DSCR: 3.49
- Minimum DSCR: 1.79
- Construction Period: 3 years with a 1-year moratoriumRepayment Period: 15 years Internal Rate of Return (IRR): 19.44% after tax
Clearances and Approvals
- Sanction and Implementation Agreement: CREDA (Chhattisgarh State Renewable Energy Agency)
- Techno-Economic Clearance: CREDA
- Power Purchase Agreement: Signed with Chhattisgarh State Power Distribution Company Ltd. (CSPDCL) on 25th March 2022
- Forest Clearances: Stage-1 clearance completed, final compliance for Stage-2 submitted.
- NOCs: Obtained from various departments including CSPGCL, Panchayat, Water Resources, Tourism Board, and Revenue Department.
Environmental Sustainability Efforts
Safety Protocols and Measures
Community Engagement and Support Initiatives

Mr. Nitin Marotrao Upare

Mr. Shyamsunder Mittal

Mr. Ranjeetsingh Chhabda






200K MWh
Energy Generated
05
Industry Partners
02
Current Projects
20
Employees
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.